Norton Gold Fields
Improvement works to an 8km mine site access road.
The project involved the complete upgrade of an 8-kilometre section of existing roadway utilising heavy earthmoving equipment.
The scope of works included the installation of drainage channels and culverts to ensure effective water management and improve long-term road performance.
The entire road alignment was sheeted with in excess of 30,000 tonnes of road base material, delivering a durable and stable surface suitable for all-weather access in and out of the mine site.
Project completed: July 2025